Concrete Patio & Pool Deck Cost in Richmond (2026)
6/17/2026 · ConcreteListings
Adding a concrete patio or pool deck in Richmond, Virginia? Here's 2026 pricing and the local details that matter in Richmond's humid with moderate winter freezes.
Concrete patio & pool deck cost in Richmond (2026)
A standard concrete patio in Richmond runs about $2350–$5350, while a finished concrete pool deck typically costs $3400–$9200 depending on size, finish, and slip-resistant treatments.
What matters locally
- Heat & finish: in Richmond's humid with moderate winter freezes, lighter colors and textured or cool-deck finishes keep surfaces comfortable underfoot.
- Drainage: proper slope and joints protect the slab on clay soils at the Piedmont/coastal-plain transition.
- Decorative options: stamped and stained finishes add to cost but are popular for pool decks here.
Richmond's blend of historic districts and suburban growth keeps both repair and new concrete work active.
Frequently asked questions
How much does a concrete pool deck cost in Richmond?
Most Richmond pool decks run $3400–$9200 depending on square footage and finish.
What's the best patio finish for Richmond?
In Richmond's humid with moderate winter freezes, slip-resistant, lighter-colored, or cool-deck finishes are popular for comfort and durability.
Get free patio & pool deck quotes in Richmond
Compare Richmond concrete contractors and request quotes.
Related guides
More from Our Blog
Concrete Patio & Pool Deck Cost in Chicago (2026)
A 12x14 broom-finish patio runs $1,250-$1,850 in Chicago; stamped runs $2,150-$3,100. See pool deck pricing, alley/gangway access costs, lakebed clay prep, and why air entrainment is non-negotiable.
Concrete Patio & Pool Deck Cost in Philadelphia (2026)
A 12x14 broom-finish patio runs $1,150-$1,650 in Philadelphia; stamped runs $1,950-$2,800. See pool deck pricing, rowhouse access surcharges, and the specs that survive 90+ freeze-thaw cycles.
Concrete Patio & Pool Deck Cost in Omaha (2026)
Omaha concrete patio and pool deck pricing for 2026 — broom, exposed aggregate, and stamped costs, why loess soil makes compaction the deciding factor, and why the short season books up by May.